Vakhsh River System Operators From Tajikistan Train at CADSWES, 2016
![reservoir formed by the dam on the Vakhsh River](/cadswes/sites/default/files/styles/large_image_style/public/article-image/1280px-nurek_dam_july.jpg?itok=ZN-eQ8E6)
Two river system operation professionals from Barqi Tojik, the agency that operates the Vakhsh River, and a project manager from Manitoba Hydro International trained at CADSWES, July 25–29, 2016. They arranged a private class to learn how to use RiverWare for operating their system and began to develop a model that incorporates their operating policies and maximize their time in the U.S. The Nurek Dam is where the hydroelectric station generates its power.
Categories: News